It took Sara a total of 42 minutes to jog from home to the park and back again, by the same path. If she averaged 8 miles per hour going to the park and 6 miles per hour coming back, what is the distance from her home to the park?
Correct answer: A. 2.4 miles
- A. 2.4 miles
- B. 2.8 miles
- C. 3.2 miles
- D. 3.6 miles
Explanation
To solve this problem, apply the formula Time = Distance/Speed. Let the distance one way be d miles. For the trip to the park, the time taken is d/8 hours, and for the return trip, it is d/6 hours. The total time for both trips is given as 42 minutes, equivalent to 0.7 hours. Thus, the equation is d/8 + d/6 = 0.7. Solving this equation by finding a common denominator (24), we get: 3d + 4d = 16.8, which simplifies to 7d = 16.8. Solving for d results in d = 2.4 miles. Therefore, Option A is correct. The other options (2.8, 3.2, 3.6 miles) overestimate the distance, leading to a time greater than 0.7 hours, and are incorrect.
Last updated
About Logical Problems
Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.
Practise Logical Problems
439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Analytical and Logical Reasoning questions like this
Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
Related questions
24 - Correct. C does double the work → C = 2 units/day, A = 1 → If C finishes in 12, total = 24 units → A = 1/day → 24 days.
5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?
8 workers complete a job in 6 days. How many are needed to complete it in 4 days?
A 3D designer renders an animation in 20 hours. If using a GPU that boosts speed by 40%, new render time is:
A alone can do a job in 12 days, B in 18 days. How long will they take together?