____________is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order.

Correct answer: B. Cold reserve

  • A. Hot reserve
  • B. Cold reserve
  • C. Spinning reserve
  • D. Firm power

Explanation

Cold reserve consists of generating units that are shut down but maintained in working condition for emergency use. Spinning reserve is already running, while hot reserve is available with little delay but is not the same as a fully shut-down reserve.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

Practise Power Systems

334 free Power Systems MCQs from Electrical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Electrical Engineering questions like this

Electrical Engineering is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Power Systems questions