In hydro power plant, the graph between discharge and time is known as___________?

Correct answer: D. hydro graph

  • A. monograph.
  • B. load graph.
  • C. discharge graph.
  • D. hydro graph

Explanation

The discharge plotted against time is called a hydrograph, which shows how the water flow available to the plant varies over time. A load graph instead plots electrical load against time.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

Practise Power Systems

334 free Power Systems MCQs from Electrical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Electrical Engineering questions like this

Electrical Engineering is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Power Systems questions