Moderate

In hydro power plant, the graph between discharge and time is known as___________?

Correct answer: D. hydro graph

  • A. monograph.
  • B. load graph.
  • C. discharge graph.
  • D. hydro graph

Explanation

The discharge plotted against time is called a hydrograph, which shows how the water flow available to the plant varies over time. A load graph instead plots electrical load against time.