In an ordinary chemical plant, electrical installation cost may be about ____________________?

Correct answer: C. Either A. or B.

  • A. 10-15% of purchased equipment cost
  • B. 3-10% of fixed capital investment
  • C. Either A. or B.
  • D. Neither A. nor B.

Explanation

Electrical installation is commonly estimated either as about 10–15% of purchased equipment cost or as roughly 3–10% of fixed capital investment, depending on the estimating basis used. Therefore both A and B are acceptable.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? support@testustad.com

Practise Plant Design and Economics

803 free Plant Design and Economics MCQs from Chemical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Chemical Engineering questions like this

Chemical Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.

More Plant Design and Economics questions