If A works at 2x speed of B, and together they finish in 12 days, A alone would do it in?

Correct answer: B. 18

  • A. 15
  • B. 18
  • C. 20
  • D. 16

Explanation

To solve this, consider the work rates: If B works at 1 unit/day, A works at 2 units/day. Together, their rate is 3 units/day, and they complete the task in 12 days, meaning the total work is 12 × 3 = 36 units. A alone would work at 2 units/day, taking 36 ÷ 2 = 18 days to finish the work. Thus, option B is correct. Options A, C, and D don't fit the calculations given these work rates.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? [email protected]

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

520 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Logical Problems questions