Moderate

If A works 6 days, B works 8, and total done = 1. Work per day = ?

Correct answer: C. 1/10

  • A. 1/14
  • B. 1/12
  • C. 1/10
  • D. 1/8

Explanation

The correct answer is 1/10. To solve this, consider the total days worked by A and B together, which is 6 + 8 = 14 days. However, the problem asks for the average work done per day by both A and B combined. By calculating the average work rate of A and B, we find that they complete the work in a rate of 1/10 of the total work per day. Thus, 1/10 is the most accurate representation of their combined work rate. Option A (1/14) incorrectly assumes a simple division of total work over total days, Option B (1/12) does not accurately reflect their contributions, and Option D (1/8) overestimates the work rate.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions