Hard

If 5 workers build a wall in 12 days, how long would 6 workers take, working at the same rate?

Correct answer: A. 10 days

  • A. 10 days
  • B. 14 days
  • C. 12 days
  • D. 15 days

Explanation

The total work is 5 multiplied by 12, that is 60 worker days, and dividing by 6 workers gives 10 days. More workers means fewer days, an inverse proportion, so an answer larger than 12 must be wrong at a glance. Checking the direction of the relationship first prevents most errors here.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? support@testustad.com

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

519 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Discussion

Stuck on an option, or know a faster way to get there? Ask or explain it here.

No comments yet. Be the first to explain this one.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 27 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

More Logical Problems questions