Asked in Premeth MDCAT 2025 — Work and Energy, Atomic Structure, Nouns 2025Moderate

Due to application of 5 N force an object moves 10 meter along perpendicular direction of the force. What amount work is done?

Correct answer: D. 0 J

  • A. 50 J
  • B. 5 J
  • C. 15 J
  • D. 0 J

Explanation

The explanation of this question is: Work is a scalar quantity that can be represented as a dot product of 2 vector quantities force and displacement. Or W = fd cos θ where θ = Angle between force and displacement When force and displacement are perpendicular, then θ = 90o and cos 90o = 0 so W = fd x 0 = 0

Last updated

About Work

Work is done when a force produces displacement, with its value determined by the component of force along the displacement. The topic covers positive, negative and zero work, work by variable forces from force-displacement graphs, and the connection between net work and change in kinetic energy.

Practise Work and Energy

748 free Work and Energy MCQs from Physics, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Physics questions like this

Physics is on 13 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions