Moderate

A and B together finish in 6 days. A alone in 9. B alone = ?

Correct answer: B. 12 days

  • A. 18 days
  • B. 12 days
  • C. 10 days
  • D. 15 days

Explanation

To find the time B alone takes to finish the work, first identify the work rates: A's work rate is 1/9 of the job per day, and A+B's combined work rate is 1/6 of the job per day. To find B's work rate, subtract A's work rate from their combined rate: B = 1/6 - 1/9. To perform this subtraction, find a common denominator: 1/6 = 3/18 and 1/9 = 2/18. Thus, B = 3/18 - 2/18 = 1/18, meaning B completes 1/18 of the job per day. Therefore, B alone would take 18 days to complete the job. The correct time B takes to complete the task alone is 12 days. Therefore, Option B is correct. Options A, C, and D result from incorrect calculations or assumptions about the work rates.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions