Moderate

5 men can do a job in 20 days. How many men are needed to complete the job in 10 days?

Correct answer: B. 10

  • A. 8
  • B. 10
  • C. 15
  • D. 20

Explanation

To solve this problem, you can use the concept of man-days, which is the product of the number of men and the number of days they work. 5 men working for 20 days means 5 x 20 = 100 man-days are needed to complete the job. If you need to complete the job in 10 days, you need 100 man-days. Therefore, you need 100 man-days / 10 days = 10 men. Option A (8 men) and Option C (15 men) would not provide the exact number of man-days required for completion in 10 days. Option D (20 men) would overshoot the requirement, finishing the job in fewer days than necessary. Thus, Option B (10 men) is correct.

Last updated

About Logical Problems

Logical problems present several conditions about people, objects, events or choices and require their possible arrangements to be tested. They cover constraint-based reasoning, rankings, matching, grouping, scheduling and elimination, with attention to the difference between a complete solution and a possibility that merely satisfies one condition.

Practise Logical Problems

439 free Logical Problems MCQs from Analytical and Logical Reasoning, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Analytical and Logical Reasoning questions like this

Analytical and Logical Reasoning is on 24 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.

Related questions