Which of the following is not a SQA plan for a project ?
Correct answer: B. amount of technical work
- A. evaluations to be performed
- B. amount of technical work
- C. audits and reviews to be performed
- D. documents to be produced by the SQA group
Explanation
An SQA plan identifies evaluations, audits, reviews, and documents to be produced by the SQA group. The amount of technical work belongs to project planning, not to the SQA plan itself.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Testing and Quality Assurance
181 free Software Testing and Quality Assurance MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Testing and Quality Assurance questions
____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
CO policy in CMM means___________________?
Degree to which design specifications are followed in manufacturing the product is called_________________?
The CMMI assessment is based on a x-point scale. What is the value of x ?
It is always best to start process analysis with a new test model ?
National Voluntary Laboratory Accreditation Program approve accreditation in ___________________?