Moderate

The switch to backup power must be completed within a deadline of______________________?

Correct answer: A. 50 ms

  • A. 50 ms
  • B. 55 ms
  • C. 70 ms
  • D. 100 ms

Explanation

A 50 ms limit is used for the backup-power switchover so the monitored system can continue operating without a noticeable interruption. Longer limits such as 100 ms may allow an unacceptable power gap.