The Process Manager has to keep track of___________________?
Correct answer: C. both A and B
- A. the status of each program
- B. the priority of each program
- C. both A and B
- D. the information management support to a programmer using the system
Explanation
A process manager maintains information about each process, including its current status and scheduling priority. These details are needed to suspend, resume, and schedule programs correctly.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Software Design and Architecture
493 free Software Design and Architecture MCQs from Software Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Software Engineering questions like this
Software Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Software Design and Architecture questions
Assembly code data base is associated with__________________?
In an absolute loading scheme, which loader function is accomplished by loader ?
Convert the .WORD d#790 assemblylanguage pseudo-ops into hexadecimal machine language________________?
A base register table___________________?
The function(s) of the Syntax phase is/ are__________________?
If special forms are needed for printing the output, the programmer specifies these forms through________________?