The most important consideration in value engineering is the_____________________?
Correct answer: B. Customer satisfaction
- A. Profit maximisation
- B. Customer satisfaction
- C. Cost reduction
- D. Process improvement
Explanation
Value engineering seeks the required function at the lowest total cost while preserving quality and performance. Customer satisfaction is the governing objective, whereas cost reduction alone could reduce the product's value or usefulness.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? support@testustad.com
Practise Plant Design and Economics
803 free Plant Design and Economics MCQs from Chemical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Chemical Engineering questions like this
Chemical Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Plant Design and Economics questions
Auto collimator is used to check____________________?
Use of economiser in a boiler plant reduces the fuel consumption for steam generation by about _______________ percent ?
Moist climate is the most favourable factor in the site selection far a_________________?
Out of the following, the joint produced by ______________ has the lowest strength?
__________________ is used for tying the steel columns to concrete foundation?
Alloys having more than 80% copper are generally more______________________?