The fixing of points in such away or the ground to have a correct lines for setting a canal or water course is called _________________?
Correct answer: A. Alignment of canal
- A. Alignment of canal
- B. Lining of canal
- C. Designing of canal
- D. All are correct
Explanation
Canal alignment is the fixing of the canal’s route and ground points so that the designed centre line can be set out correctly. Lining is a later construction treatment used to reduce seepage and erosion.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Irrigation and Water Management
262 free Irrigation and Water Management MCQs from Agriculture, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Agriculture questions like this
Agriculture is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Irrigation and Water Management questions
That part of the flow in a stream comes from sub-soil or valley, may be beneath the top surface of channel bed is called__________________?
The ratio of specific weight of any liquid to the specific weight of water is called as _________________?
The weight per unit of liquid at standard Temperature and pressure is called___________________?
The piezometric level of water in the well at zero discharges is called___________________?
Volume of water that unit volume of aquifer will give up by gravity pull is called ____________________?
An aquifer in which water contained under high pressure as the' aquifer is sand witched between two impervious layer is called___________________?