The fixing of points in such away or the ground to have a correct lines for setting a canal or water course is called _________________?
Correct answer: B. Alignment of canal
- A. Lining of canal
- B. Alignment of canal
- C. Designing of canal
- D. All are correct
Explanation
Canal alignment is the fixing of the canal’s route and ground points so that the designed centre line can be set out correctly. Lining is a later construction treatment used to reduce seepage and erosion.
Last updated
Practise Irrigation and Water Management
262 free Irrigation and Water Management MCQs from Agriculture, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Agriculture questions like this
Agriculture is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
Related questions
1 Cusec is 28.3 liters, 1 Cumec is 1000 liters. So, 1 ha mm :
A channel artificially constructed for water conveyance of appreciable quantities with no problem of silting and scouring is called ____________________?
A channel is said lo be of most economical cross section, for a given cross-sectional area and bed slope when it __________________?
A closed conduct or barrel used used for supplying water under high pressure to a turbine to generate electricity is called __________________?
A cloud is formed due to condensation. it consists of a small particle of ice an. small droplets of water, having diameter about ___________microns?