The costing technique, which traces direct costs by multiplying price rate for producing actual outputs is known as ______________?
Correct answer: B. standard costing
- A. constant costing
- B. standard costing
- C. unit costing
- D. batch costingGet Executive Coaching
Explanation
Standard costing applies predetermined standard price or rate and quantity amounts to actual output, allowing actual results to be compared with standards through variances. Unit and batch costing describe the unit of cost accumulation rather than this standard-versus-actual technique.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? support@testustad.com
About Cost Accounting
Cost accounting measures and analyses the cost of producing goods or providing services for planning, control and pricing decisions. It covers direct and indirect costs, fixed and variable costs, job and process costing, break-even analysis, marginal costing, overhead allocation, and the difference between product cost and period cost.
Practise Cost Accounting
941 free Cost Accounting MCQs from Accounting, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Exams that ask Accounting questions like this
Accounting is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Cost Accounting questions
The cost allocation base used by an operating manager is classified as ____________?
The difference between actual variable overhead cost and flexible budget variable overhead amount is termed as __________?
An energy, machine maintenance, indirect materials and engineering support are considered as ____________?
The flexible budget amount is added in to variable overhead flexible budget variance to calculate ____________?
The depreciation on plant equipment, salaries of plant managers and plant leasing costs are considered a _____________?
The budgeting method, which incorporates an improvement anticipated in budgeting period into budget numbers, can be classified as ___________?