'Six-tenth factor' rule is used for estimating the_________________?

Correct answer: B. Equipment cost by scaling

  • A. Equipment installation cost
  • B. Equipment cost by scaling
  • C. Cost of piping
  • D. Utilities cost

Explanation

The six-tenths rule estimates the cost of equipment at a new capacity from the known cost at another capacity: cost varies approximately as capacity to the 0.6 power. It is therefore an equipment-scaling method.

Written and checked by , MS Computer ScienceLast updated
Report an error

The more specific you are, the faster it gets fixed. A source beats an opinion.

Prefer email? support@testustad.com

Practise Plant Design and Economics

803 free Plant Design and Economics MCQs from Chemical Engineering, each with the correct answer and an explanation. Unlimited attempts, no account needed.

Exams that ask Chemical Engineering questions like this

Chemical Engineering is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.

More Plant Design and Economics questions