Selection of the "best" alternative should be based on several factors:
Correct answer: C. All of the above
- A. Technical soundness of the plan
- B. Available resources in terms of funding, manpower, infrastructure, etc.
- C. All of the above
- D. Institutional (legal, political) potential for success
Explanation
The best watershed-management alternative must be technically feasible, compatible with available funds and manpower, and legally and institutionally capable of succeeding. A technically sound plan may still fail if resources or institutional support are lacking.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Forest Management
269 free Forest Management MCQs from Forestry, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Forestry questions like this
Forestry is on this paper prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for it.
More Forest Management questions
The inventory should include the collection of data requirements are:
Watershed management planning phases is / are:
Management constraints - the constraints of management need to be identified in the initial phase of planning:
Watershed works plan - A detailed plan of operation should be developed which permits a timely, appropriately funded (quarterly, annually, etc.) operation of the plan. The plan should include details of:
Range improvement techniques are:
Range reseeding is: