Hunder Hydro power project is being constructed by India on:
Correct answer: B. Indus River
- A. Jhelum River
- B. Indus River
- C. Chenab River
- D. Ravi River
Explanation
Hunder is classified as a project in the Indus River system of Ladakh. It is therefore distinct from projects located in the Jhelum, Chenab or Ravi systems.
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
Practise Foreign Policy of Pakistan
205 free Foreign Policy of Pakistan MCQs from International Relations, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask International Relations questions like this
International Relations is on 2 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Foreign Policy of Pakistan questions
Bhaderwah Hydro power project is being constructed by India on:
The purpose of Indus Basin treaty was:
Marpachoo Hydro power project is being constructed by India on:
Ganderbal Hydro power project is being constructed by India on:
Karnah Hydro power project is being constructed by India on:
Baglihar Dam is located in