A man holds a bucket by applying force 10N. He then moves it a horizontal distance of 5m and a vertical distance of 10m, find out the net work done.
Correct answer: A. 100 J
- A. 100 J
- B. 150 J
- C. 50 J
- D. 200 J
Explanation
WD = f x d cos θ For horizontal distance let θ be 90˚ 10 x 10 x cos90 = 0 For vertical distance, θ is 0˚ 10 x 10 x cos0 = 100 Net work done = 100J
Report an error
The more specific you are, the faster it gets fixed. A source beats an opinion.
Prefer email? [email protected]
About Work
Work is done when a force produces displacement, with its value determined by the component of force along the displacement. The topic covers positive, negative and zero work, work by variable forces from force-displacement graphs, and the connection between net work and change in kinetic energy.
Practise Work and Energy
748 free Work and Energy MCQs from Physics, each with the correct answer and an explanation. Unlimited attempts, no account needed.
Discussion
Stuck on an option, or know a faster way to get there? Ask or explain it here.
No comments yet. Be the first to explain this one.
Exams that ask Physics questions like this
Physics is on 16 papers prepared for on TestUstad, and all of them draw the same bank, so this question is worth knowing for every one of them.
More Work questions
A constant force of 20N is applied in a horizontal direction and the distance travelled in the direction of the force is 5m. The work done is:
A 4kg eagle picks up a 75g snake and raises it 2.5 m from the ground to a branch. What is the workdone by the eagle on the snake? (g=10m/s2)
A constant force of F=(i-2j-3k) causes a displacement d=(2i-5j+k), what will be the net workdone if f is in N and displacement is in meters?
An object is displaced from point A (2, 3, 4) m to point B (1, 2, 3) m under a constant force, F= (2i + 3j + 4k). Find the work done by this force in this process:
The work done by a conservative force in a complete cycle is:
When a spring is stretched, the work done by the stretching force is: